container terminal

Facility Information

Hiroshima Port International Container Terminal

This advanced terminal has the deepest quay in the Chugoku and Shikoku Regions (-14/-7.5 m), and is equipped with 3 gantry cranes and 2 container freight stations. HiDECS (container terminal operation system) provides smooth operation, contributing to further reduction in costs.

Terminal Equipment

  • Gantry crane

  • Transfer crane (hybrid type)

  • Reach stacker

  • Side lifter

  • IN/OUT gate

  • Control center

Terminal Layout

Facilities Outline

Terminal area
114,900m²
Quay
14m quay 330m (1berth)
-7.5m quay 150m (1berth)
Gantry cranes
40.6-t hoist x 2 units (Lift height: 48.5m, Outreach: 44.5m)
30.5-t hoist x 1 units (Lift height: 27.0m, Outreach: 23.5m)
Reefer plugs
76
Container storage space
Approx. 8,000 TEU

Fees

Classification Facility Unit Price
Mooring facilities Water depth -14m quay

Per ton of total tonnage per mooring

Classification Ocean-going vessel Other vessels
Up to 2 hours 2.27yen 2.48yen
2 to 4 hours 2.65yen 2.90yen
4 to 6 hours 3.03yen 3.33yen
6 to 12 hours 4.04yen 4.44yen
12 to 24 hours 5.39yen 5.92yen
Each additional 24 hours 6.82yen 7.48yen
Water depth -7.5m quay

Per ton of total tonnage per mooring

Classification Ocean-going vessel Other vessels
Up to 2 hours 2.27yen 2.48yen
2 to 4 hours 2.65yen 2.90yen
4 to 6 hours 3.03yen 3.33yen
6 to 12 hours 4.04yen 4.44yen
12 to 24 hours 5.39yen 5.92yen
Each additional 24 hours 6.82yen 7.48yen
Cargo handling facilities Gantry crane 22,000 yen every 30 minutes
Cargo handling area
- Container yard
- Vanning yard
- Hazardous material yard, etc.
4.17yen per 1m² per day
Container freight station 23.88yen per 1m² per day

Access